Although some of the councillors seemed to have get cold feet, is the refurbishment of the indoor swimming pool is a done deal.
Puchheim – With a large majority of the city Council for the conversion and extension of the bathing establishment at the Gerner court, the costs of which are estimated to be almost 14 million euros, agreed. According to the preliminary schedule, the part will begin demolition early next year. The conversion time is estimated at three years.
the renovation of what is necessary
especially from the CSU two years ago taken in principle decision for the remediation in question. A new building in the same place would be perhaps even cheaper, said Karin Kamleiter. Ramona Fruhner-and-White referred to the new roof Auer of the bathroom came with all the Extras only 22 million. In addition, a new hold out much longer. “A little more appeal for 14 million?” asked Sonja Strobl-Viehhauser. Because of an additional basin, and even the children would swim, and a tag is not concern for suitable personnel. You are recommended to restore only the “what Not do”.
in the opinion of the management such as the still-functioning structural design or the more usable the supply piping to the adjacent school as well as the reduced construction time for a tag but speak. And sustainability of hot to use usable. Also, CSU spokesman Thomas Hofschuster, and which contributed to a controversial discussion in his group, saw no Alternative. A new building, which was estimated according to a previous cost estimate with a similar sum, is today also get at that price.
Intensive financial debate required
Fundamental Günter Hoiß (CSU): the renovation of the primary school North at a cost of a seven-figure sum, and a further 200 million will spend in the city in the next five, six years. A financing concept was not there. “We cut millions out of it without end,” admitted mayor Norbert Seidl (SPD). For serious estimates, which will cost the new city center, but it has no basis. And the best time for intensive financial debate was after the local elections in 2020.
The 51-year-old indoor swimming pool is wheelchair accessible, gets new locker rooms and toilets, as well as a second teaching pool. Thus, more opportunities for students, clubs and swimmers. In outdoor patio, lawn, and a water play area deck. (Olf Paschen)
Also interesting: here we go: start of construction in the public Park