The University Schouwbrug will be on Friday, march 6, through Saturday, april 11th, am. Motorists will be diverted over to the Haagweg, and pedestrians and cyclists using the Stevensbrug.
On weekdays, the Stevensbrug during the peak of traffic in one direction and opened up. In the morning, between 7: 30 and 9: 30 a.m., cars in the neighborhood out through the Stevensbrug.
During the afternoon peak hours from 16: 00 to 18: 30 hours, the area to be reached by the Stevensbrug. Freight traffic is excluded. Traffic controllers ensure the safe and smooth flow of traffic.
The Hague, Schouwbrug is when the work is closed to all traffic. During the works, the bridge is often open, which makes it vaarverkeer a little discomfort. During the trial period from 30 march to 3 april, the bridge is regularly opened and closed. Ship remains to be done.
On Monday, april 20, to Monday, may 18, will work with the contractor to Stevensbrug. All of the bus-, bicycle -, and pedestrian traffic will then be routed through the University Schouwbrug.